HALF PEDESTAL, RESERVOİRS, FLOOR STANDING, GLAZING BOOTHS, ROBOTİC GLAZING BOOTHS, SLIP PREPARATION, GLAZE PREPARATION, WASHBASIN MODELLING, WATER CLOSET MODELLING, MOTHER MOULD PRODUCTİON, SANITARYWARE PRODUCTION, SANITARYWARE MANUFACTURING, WASHBASIN PRODUCTION, WC PRODUCTION, DRYERS, GREENWARE DRYERS SANITARYWARE MACHINES, ONE PIECE CLOSET, BODY PREPARATION, CASTING, DRYING, FIRING, GLAZING, TRADITIONAL CASTING PLANTS, HIGH PRESSURE CASTING PLANTS, PRESSURE CASTING PLANTS FOR WASHBASINS, PRESSURE CASTING PLANTS FOR PEDESTALS, PRESSURE CASTING PLANTS FOR TANKS, PRESSURE CASTING PLANTS FOR LIDS, PRESSURE CASTING PLANTS FOR SHOWER TRAYS, PRESSURE CASTING PLANTS FOR KITCHEN SINKS, PRESSURE CASTING PLANTS FOR STICK ON RIM, PRESSURE CASTING PLANTS FOR SQUATTING WC PANS, CASTING PLANTS FOR WC AND BIDETS,

UKCast Ceramic Machinery and Mould Company

IS THE SOLUTION PARTNER OF SANITARYWARE PRODUCERS, NOT ONLY A MACHINERY MANUFACTURER.

OUR MISSION

On every job, we demand the highest quality standards in all our products and services.

BEST QUALITY

We are committed to meeting the highest quality standards without compromising our.

EXPERIENCED

With our years of experience you can bet on us to get the job done exactly.

ON TIME

We respect the customer’s time and schedule and always complete the projects on time.

Slip and Glaze Receipts Developments

Adequate corrections would be made according to the detected the requirements of slip receipt. During all this analysing process would be viewed all conditions in each department of manufacturing area. By consideration of the cost of the new or replaced raw materials or percentages of the existing raw materials, the new receipt will be more productive and lesser cost.

Efficiency Enhancement and Cost Reduction System Setup

To correct the problems and determine approaches to organization of production department it is necessary to identify the key factors to ensure casting – glazing – firing process.

Managing, Analysing and Tracking Methods of each department to reduce cost in each step of production.

Sanitaryware Manufacturing Process Developments New Project Lay Out & Flow Sheet Consultancy

Flowsheet development is a series of steps in which a conceptual process is repeated evaluated, modified, and reevaluated until it becomes practical. Although it can take many forms (for instance, the plant can be built and then modified), it usually follows a pattern of laboratory work (which may be multiphase), piloting (which can also be multiphase), and demonstration piloting in cases when commercialization risks are particularly high.

A process needs to be guided toward an operable, low-cost flowsheet that will provide lesser costed products while considering the climate of the production area, end of the day the product can not be economically effective even if they are technically effective. Process development is normally undertaken in conjunction with engineering and economic studies (scoping, prefeasibility, feasibility, etc.) that all need to be view from the third experienced eye in relevant industry.

 

Technical Trainees

  • APPLICATION ENGINEERING - New product development and design improvement based on cost reduction, manufacturing or customer expectations

  • COST MANUFACTURING estimation for inquiry

  • MANUFACTURING ENGINEERING - Production process practices (Body & Glaze Preparation, Traditional Casting Methods, High Pressure Casting Methods, Manual and Robotic Glazing Methods, Firing, Inpection, Quality Control)

  • PLANNING - Production/project planning, tracking advancement

  • Drive proactive decision for eliminating risk of delivery delays in Sanitaryware Production

  • Cost reduction actions

  • Regular manufacturing capacity/capability analysis

  • Purchasing - Make or buy analysis

  • Continuous improvement (Kaizen, A3)